Today, on behalf of the BH FF, Adnan Džemidžić and Nihad Hodžić, together with the Mayor of Centar Municipality, Srđan Mandić, visited the Asim Ferhatović-Hase Stadium, where the reconstruction of the main pitch was carried out.
During the visit of the Asim Ferhatović-Hase Stadium, the representative of the supervisory authority informed the attendees of the schedule of works in the previous period. On this occasion, it was emphasized that a new grass sod was placed on the main pitch, and a drainage filter layer was installed underneath, which will be able to absorb large amounts of water. As part of the reconstruction of the main pitch, a state-of-the-art heating system was installed, which will enable the smooth running of sports events in the winter period.
Due to the current weather conditions in our country, it is necessary to wait for more favourable weather conditions when it will be possible to access the final stage, “sewing” the fibers of the hybrid into the existing lawn on the main pitch. With the completion of these works, it will be possible to play football matches at the Asim Ferhatović-Hase Stadium.